The investment, which has resulted in the creation of six jobs, includes a 12 metre capacity loading system and an LT8 tube laser.
The 12 metre capacity loading system is said to be unique to the Barrett Group, with other processors offering a maximum of 8.5 metre capacity.
Barrett Steel Ltd
+44 (0)1274 682281
Related articles:

Barrett Offshore Tubes, part of the Barrett Steel Group, reports it has recently invested over £1m at its Scunthorpe site as part of the company's commitment to the renewable energy market, particularly the offshore wind turbine industry.